Refill after drain or replaster

Refill after a drain, acid wash or replaster

The pool is empty and the clock is ticking. We line up a local tanker hauler to refill it quickly and continuously, timed around your contractor’s schedule.

Best for
New plaster, acid washes, drain and refill
Key point
Fill without stopping
Timing
Book as soon as you have a date

Sizes and loads are typical figures; your quote confirms them.

Empty pool with new white plaster and the first water spreading across the floor

Why speed matters after a replaster

Pool professionals generally recommend filling a freshly plastered pool continuously, without stopping, and keeping anyone out of the pool until it is full. A pause can leave a visible line where the water sat. A delivered fill brings the water in large, steady loads.

Your plasterer’s start-up instructions come first. They may tell you exactly when filling should begin and what to put on the hose end.

Why not leave the pool empty

An empty in-ground pool is under stress. In areas with high groundwater, an empty shell can be pushed up; in clay soils, ground movement can affect it. Contractors usually plan the refill to start as soon as the work is done.

Draining is a separate job. Many cities require pool water to go to the sanitary sewer or limit where it can be discharged, and some have rules about refilling during drought. Your pool contractor handles the drain; check your local rules before you start.

What to tell us

  • The date the plaster or acid wash finishes, and the time your contractor wants filling to start.
  • Pool size, so we know how many loads and whether more than one truck is needed to keep the water coming.
  • Hose distance from the street and gate access.

Refill after drain or replaster: questions

How soon after plastering should the pool be filled?

Follow your plasterer’s instructions. Most want filling to start right after the finish is applied and to continue without stopping until the pool is full.

Can you keep the water coming without a gap?

For bigger pools we ask the hauler about back-to-back loads or a second truck so there is no long pause. Tell us it is a new finish and we plan around it.

Do you drain the pool too?

No. Draining is done by your pool contractor, who should follow local discharge rules. We handle the water coming back in.

Other things we fill

In-ground pool fill

First fills for new pools and full refills, usually in a single visit.

Well-water homes

Spare your pump and well; avoid iron and sediment in a new pool.

Cistern and tank fill

Homes, cabins, farms and job sites. Potable haulers when you need them.

Skip the two-day hose fill

Tell us the ZIP, the size and the access. A person lines up a vetted local hauler and sends you one delivered price.

Get my delivered price
Get my delivered price